{"id":3832,"date":"2025-03-01T10:00:06","date_gmt":"2025-03-01T10:00:06","guid":{"rendered":"https:\/\/cavitetimesjournal.net\/?p=3832"},"modified":"2025-03-01T10:00:07","modified_gmt":"2025-03-01T10:00:07","slug":"calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025","status":"publish","type":"post","link":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/","title":{"rendered":"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025"},"content":{"rendered":"\n<p>Construction of the Cavite-Laguna (CALAX) Governor\u2019s Drive Interchange is now nearing 40% completion, keeping it on track for target opening in the second half of 2025. This 8.64-kilometer segment will connect Silang (Aguinaldo) Interchange to Governor\u2019s Drive in General Trias, Cavite, further enhancing mobility and reducing congestion in the region.&nbsp;<\/p>\n\n\n\n<p>Once operational, this new segment will further enhance CALAX\u2019s connectivity providing faster, seamless travel to General Trias and nearby areas. It will also ease traffic congestion on Governor\u2019s Drive and Aguinaldo Highway.&nbsp;<\/p>\n\n\n\n<p>\u201cWe are committed to completing the entire stretch of CALAX by 2025. Its full opening will not only ease traffic and improve connectivity but also support economic growth by enhancing access to key areas in Cavite and Laguna.\u201d said Ms. Elnora D. Rumawak, Officer-in-Charge of MPCALA Holdings Inc.&nbsp;<\/p>\n\n\n\n<p>Meanwhile, construction continues on its remaining sections, with Subsection 1 (Kawit Interchange) now over 31% complete, and Subsection 2 (Open Canal Interchange) at 21.9% completion.&nbsp;<\/p>\n\n\n\n<p>Once completed, CALAX will stretch 45 kilometers from&nbsp;Mamplasan&nbsp;Rotunda in Laguna to&nbsp;Kawit, Cavite, integrating with major expressways to provide a seamless connection between Cavite, Laguna, and Metro Manila. The expressway will feature a total of eight interchanges: Laguna Technopark, Laguna Boulevard, Santa Rosa-Tagaytay Road, Silang East, Silang (Aguinaldo), Governor\u2019s Drive, Open Canal, and&nbsp;Kawit&nbsp;Interchange.&nbsp;&nbsp;<\/p>\n\n\n\n<p>CALAX will connect with the Manila-Cavite Expressway (CAVITEX) in&nbsp;Kawit, providing a more efficient route for motorists traveling between Cavite, Laguna, and Metro Manila. Once the entire expressway is fully operational, it is expected to serve up to 95,000 vehicles daily, significantly improving travel times and boosting economic activity in the region.&nbsp;<\/p>\n\n\n\n<p>MPCALA Holdings Inc., concessionaire of the Cavite-Laguna Expressway,&nbsp;is a subsidiary of Metro Pacific Tollways Corporation. Aside from CALAX, MPTC\u2019s domestic portfolio also includes the Manila-Cavite Expressway (CAVITEX), North Luzon Expressway (NLEX), the NLEX Connector Road, the Subic-Clark-Tarlac Expressway (SCTEX), and the Cebu-Cordova Link Expressway (CCLEX) in Cebu.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction of the Cavite-Laguna (CALAX) Governor&rsquo;s Drive Interchange is now nearing 40% completion, keeping it on track for target opening<\/p>\n","protected":false},"author":2,"featured_media":3833,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"colormag_page_container_layout":"default_layout","colormag_page_sidebar_layout":"default_layout","om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[44,8,34],"tags":[],"class_list":["post-3832","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-national","category-news","category-travel"],"aioseo_notices":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025 - CAVITE TIMES JOURNAL<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025 - CAVITE TIMES JOURNAL\" \/>\n<meta property=\"og:description\" content=\"Construction of the Cavite-Laguna (CALAX) Governor&rsquo;s Drive Interchange is now nearing 40% completion, keeping it on track for target opening\" \/>\n<meta property=\"og:url\" content=\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"CAVITE TIMES JOURNAL\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-01T10:00:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-03-01T10:00:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"681\" \/>\n\t<meta property=\"og:image:height\" content=\"383\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"CAVITE TIMES JOURNAL\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"CAVITE TIMES JOURNAL\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/\"},\"author\":{\"name\":\"CAVITE TIMES JOURNAL\",\"@id\":\"https:\/\/cavitetimesjournal.net\/#\/schema\/person\/bd853cb635a9b7d9aa2333fe921239a8\"},\"headline\":\"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025\",\"datePublished\":\"2025-03-01T10:00:06+00:00\",\"dateModified\":\"2025-03-01T10:00:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/\"},\"wordCount\":334,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/#organization\"},\"image\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg\",\"articleSection\":[\"NATIONAL\",\"News\",\"Travel\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/\",\"url\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/\",\"name\":\"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025 - CAVITE TIMES JOURNAL\",\"isPartOf\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg\",\"datePublished\":\"2025-03-01T10:00:06+00:00\",\"dateModified\":\"2025-03-01T10:00:07+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage\",\"url\":\"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg\",\"contentUrl\":\"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg\",\"width\":681,\"height\":383},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/cavitetimesjournal.net\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/cavitetimesjournal.net\/#website\",\"url\":\"https:\/\/cavitetimesjournal.net\/\",\"name\":\"CAVITE TIMES JOURNAL\",\"description\":\"PAHAYAGAN NG TUNAY NA CAVITE\u00d1O\",\"publisher\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/cavitetimesjournal.net\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/cavitetimesjournal.net\/#organization\",\"name\":\"CAVITE TIMES JOURNAL\",\"url\":\"https:\/\/cavitetimesjournal.net\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/cavitetimesjournal.net\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2023\/11\/CTJ-LOGO.jpg\",\"contentUrl\":\"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2023\/11\/CTJ-LOGO.jpg\",\"width\":360,\"height\":100,\"caption\":\"CAVITE TIMES JOURNAL\"},\"image\":{\"@id\":\"https:\/\/cavitetimesjournal.net\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/cavitetimesjournal.net\/#\/schema\/person\/bd853cb635a9b7d9aa2333fe921239a8\",\"name\":\"CAVITE TIMES JOURNAL\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/cavitetimesjournal.net\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b63de9ec9d02248cd7554f8b3d2c2941?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b63de9ec9d02248cd7554f8b3d2c2941?s=96&d=mm&r=g\",\"caption\":\"CAVITE TIMES JOURNAL\"},\"url\":\"https:\/\/cavitetimesjournal.net\/author\/ctj_ronalyn\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025 - CAVITE TIMES JOURNAL","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/","og_locale":"en_US","og_type":"article","og_title":"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025 - CAVITE TIMES JOURNAL","og_description":"Construction of the Cavite-Laguna (CALAX) Governor&rsquo;s Drive Interchange is now nearing 40% completion, keeping it on track for target opening","og_url":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/","og_site_name":"CAVITE TIMES JOURNAL","article_published_time":"2025-03-01T10:00:06+00:00","article_modified_time":"2025-03-01T10:00:07+00:00","og_image":[{"width":681,"height":383,"url":"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg","type":"image\/jpeg"}],"author":"CAVITE TIMES JOURNAL","twitter_card":"summary_large_image","twitter_misc":{"Written by":"CAVITE TIMES JOURNAL","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#article","isPartOf":{"@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/"},"author":{"name":"CAVITE TIMES JOURNAL","@id":"https:\/\/cavitetimesjournal.net\/#\/schema\/person\/bd853cb635a9b7d9aa2333fe921239a8"},"headline":"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025","datePublished":"2025-03-01T10:00:06+00:00","dateModified":"2025-03-01T10:00:07+00:00","mainEntityOfPage":{"@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/"},"wordCount":334,"commentCount":0,"publisher":{"@id":"https:\/\/cavitetimesjournal.net\/#organization"},"image":{"@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg","articleSection":["NATIONAL","News","Travel"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/","url":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/","name":"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025 - CAVITE TIMES JOURNAL","isPartOf":{"@id":"https:\/\/cavitetimesjournal.net\/#website"},"primaryImageOfPage":{"@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage"},"image":{"@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage"},"thumbnailUrl":"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg","datePublished":"2025-03-01T10:00:06+00:00","dateModified":"2025-03-01T10:00:07+00:00","breadcrumb":{"@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#primaryimage","url":"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg","contentUrl":"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2025\/03\/Picture9.jpg","width":681,"height":383},{"@type":"BreadcrumbList","@id":"https:\/\/cavitetimesjournal.net\/index.php\/2025\/03\/01\/calax-governors-drive-interchange-nears-40-completion-set-to-open-in-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/cavitetimesjournal.net\/"},{"@type":"ListItem","position":2,"name":"CALAX Governor\u2019s Drive Interchange Nears 40% Completion, Set to Open in 2025"}]},{"@type":"WebSite","@id":"https:\/\/cavitetimesjournal.net\/#website","url":"https:\/\/cavitetimesjournal.net\/","name":"CAVITE TIMES JOURNAL","description":"PAHAYAGAN NG TUNAY NA CAVITE\u00d1O","publisher":{"@id":"https:\/\/cavitetimesjournal.net\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/cavitetimesjournal.net\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/cavitetimesjournal.net\/#organization","name":"CAVITE TIMES JOURNAL","url":"https:\/\/cavitetimesjournal.net\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cavitetimesjournal.net\/#\/schema\/logo\/image\/","url":"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2023\/11\/CTJ-LOGO.jpg","contentUrl":"https:\/\/cavitetimesjournal.net\/wp-content\/uploads\/2023\/11\/CTJ-LOGO.jpg","width":360,"height":100,"caption":"CAVITE TIMES JOURNAL"},"image":{"@id":"https:\/\/cavitetimesjournal.net\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/cavitetimesjournal.net\/#\/schema\/person\/bd853cb635a9b7d9aa2333fe921239a8","name":"CAVITE TIMES JOURNAL","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cavitetimesjournal.net\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b63de9ec9d02248cd7554f8b3d2c2941?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b63de9ec9d02248cd7554f8b3d2c2941?s=96&d=mm&r=g","caption":"CAVITE TIMES JOURNAL"},"url":"https:\/\/cavitetimesjournal.net\/author\/ctj_ronalyn\/"}]}},"_links":{"self":[{"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/posts\/3832","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/comments?post=3832"}],"version-history":[{"count":1,"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/posts\/3832\/revisions"}],"predecessor-version":[{"id":3834,"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/posts\/3832\/revisions\/3834"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/media\/3833"}],"wp:attachment":[{"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/media?parent=3832"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/categories?post=3832"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cavitetimesjournal.net\/index.php\/wp-json\/wp\/v2\/tags?post=3832"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}